Pictures Before Remodel
Turn-style door and inlay will remain; door will be inoperable.
Elevators will be upgraded. Marble, door fronts, and terrazzo flooring will remain.
Sakakawea inlay and terrazzo flooring will remain.
Marble, window, and door at bottom of stairs will be removed to install an accessible ramp.
Telephone booth will be repurposed to a display booth.
All mail chutes will remain in place and be inoperable.
All service lifts will remain and be inoperable.
The weather beacon will remain with updated light-emitting diode (LED) lighting.
Remodel Pictures
West parking lot, fenced, facing east
West parking lot, fenced, facing south
Original light switch from sixth floor
Existing support columns on sixth floor. We're working with support columns on every floor.
Garbage chute to expedite debris removal.
Partial demolition picture on fifth floor showing old heating units under windows. All all heating units are being removed.
Crane delivery of drywall to fifth floor. Beacon is green!
Fifth floor demolition.
Street view during remodel process. Weather beacon is will remain and receive updated lighting. "Provident Building" signage will be removed due to rust and safety hazard. Windows will be replaced and have the same reflectivity.
Sixth floor during demolition.
Framing on fourth floor.
Sixth floor corner office with framing and drywall. Look at that view!
Contact Us
Public Information Officer
Burleigh County
4200 Coleman St
Bismarck, ND 58503
Phone: (701) 222-6727
E-mail